A GERT-based analytical method for remanufacturing process routing

Congbo Li, Ying Tang, Chengchuan Li

Research output: Chapter in Book/Report/Conference proceedingConference contribution

11 Scopus citations

Abstract

This paper presents a GERT (Graphical Evaluation and Review Technique)-based analytical method for uncertainty management of remanufacturing. Four GERT-based stochastic remanufacturing process routing (RPR) models are first proposed. A remanufacturing system that consists of various process flows is then analyzed, where the probability of and the time associated with individual process are estimated. Finally, the method is demonstrated through the remanufacturing of used lathe spindles, and validated by Arena simulation.

Original languageEnglish (US)
Title of host publication2011 IEEE International Conference on Automation Science and Engineering, CASE 2011
Pages462-467
Number of pages6
DOIs
Publication statusPublished - Dec 5 2011
Externally publishedYes
Event2011 7th IEEE International Conference on Automation Science and Engineering, CASE 2011 - Trieste, Italy
Duration: Aug 24 2011Aug 27 2011

Other

Other2011 7th IEEE International Conference on Automation Science and Engineering, CASE 2011
CountryItaly
CityTrieste
Period8/24/118/27/11

    Fingerprint

All Science Journal Classification (ASJC) codes

  • Control and Systems Engineering
  • Electrical and Electronic Engineering

Cite this

Li, C., Tang, Y., & Li, C. (2011). A GERT-based analytical method for remanufacturing process routing. In 2011 IEEE International Conference on Automation Science and Engineering, CASE 2011 (pp. 462-467). [6042398] https://doi.org/10.1109/CASE.2011.6042398